Friday, February 10, 2017

Tunnel Trail Tread Repair and Erosion Prevention



This section of trail has been narrowed by rockfall and slough leaving the trail begin eroded off the edge


After- wider and safety with outsloping


Several rutting by improper water drainage



Water drains placed above this area and in the foreground will help prevent erosion below this area



No comments: