Tunnel Trail Winter Preparation, Saturday 10/17/09

The nearly 20 people who volunteered for the winter preparation of Tunnel Trail Saturday were all guaranteed two things, soreness throughout their bodies the next day and a feeling of accomplishment. That is what I took away from it as I helped prepare the trails for winter rains with USFS engineer Garrett Villanueva. Garrett has been hired by local agencies with emergency funding to come and help prevent erosion on trails affected by the Jesusita Fire. Our main objective Saturday was improving the trails outdated water drainage features. The WDF's that currently exist on the trails cannot hold up to the amount of water and sediment that will run down the trails when the rains come. New and improved WDF's will last for a long long time giving our trails protection years after the hillsides have grown back.

We started of right at the base of Tunnel Trail where Garrett had marked the deeply rutted trail for improvement. Garrett then explained and demonstrated all the steps in building a WDF- excavating, rock locating, excavating, rock placement, more excavating, then covering it all up. A typical old fashioned "water bar" we are used to seeing on our trails is about a foot or two in width. These new WDF's are about 25 feet in width but when built correctly they are hardly noticeable by trail users. The key to WDF's also known as "rolling grade dips" or "knicks" is the wide catch area to pull water and sediment from the trail thus preventing erosion damage further down the trail.

What goes into building these WDF's is a ton of work and engineering. No machine or device can help either, this is work that needs to be done by hand and a rough guess of the amount of dirt and rock we moved Saturday had to be several tons of each. The 5 WDF's we completed in about the same number of hours only covered 1/4 mile of trail, there are miles and miles left that need to be done. For the next several weeks Garrett will train and lead the California Conservation Corps out on the trails affected by the Jesusita Fire to try and finish where we left off. Big thanks to to everyone who helped out including: Joani, Sonia, Liz, Deanna, Kristi, Chris, Paul, Rick, Richard, Ken, Greg, James, Jim, Ranger Kerry Kellogg, and of course Garrett Villanueva. Dave


Tunnel Trail and the hydromulched hillsides
Garrett gives a pep talk
Measuring the distance of the WDF
Step two, excavating
Step three, placement of large rock
Finished product

Another WDF-before
After

A small WDF before

The women of the trail- Liz, Sonia, and Deanna building the WDF

After

The WDF of the day was this monster
Same "monster" back in April of 09

Excavating the monster

A well placed layer of huge rocks is key to WDF success

How to we found some of the huge rocks
Garrett taming the monster
The "steps" are starting to take shape
The crew removing the large burm on the side of the trail
Proud volunteers on the tamed monster

The monster from above

From below, quite a difference

Trail scorpion

It's a dirty job!

Thursday, October 15, 2009

Tunnel Trail Survey and Winter Prep

Still sprinkling a little, myself and USFS trail engineer Garrett Villanueva headed out onto Tunnel Trail to begin Garrett's survey and trail data logging. Villanueva, an engineer from the Lake Tahoe area has been hired by the local agencies to help prepare the trails affected by the Jesusita fire for upcoming winter weather. Wednesday's task was deciding what water features to work on and then come back and log it into a database. Several volunteers this week will be accompaning Garrett and help him with the process.

Overall Garrett said, "the trail is not that bad." Clearly there is a lot of work that needs to be done in order for the trails to still be here when Spring comes around. Garrett pointed out dozens of "water bars" and other water features that needed to be improved in order to prevent massive erosion this winter. There are three major risks to trails following a fire Garrett pointed out to local agencies: increased waterflow on the trail, slope failures, and rockslides. All three risks were found today as we hiked Tunnel Trail.

The good news is the three major risks can be minimized if preventative measures are taken. Garrett will be teaching local trail "Crew Leaders" and other interested trail users these techniques this Saturday followed by a work session on Tunnel Trail to put that learning into action. Garrett will also be teaching and leading the CCC these same things over the next few weeks on our trails. He said that with the amount of work that needs to be done, it will be a difficult task to get all the work done in the time and resources allotted. Dave

If interested in helping out this Saturday, contact Ranger Kerry Kellogg for more info: kkellogg@fs.fed.us



The paved part of Tunnel Trail with rockslides (and trespassers)

Some of the Cal Trans/County damage prevention on Tunnel Trail
New fencing near the bridge
Hydromulch up close- look no garbage! A hydromulched section of the trail with hillsides still intact but showing signs of water runoff damage.
Garrett flagging a section for improvement
Rutting of the trail thanks to slide material and poor water control
This waterbar is still working
A large rockslide covering the entire trail
Tunnel Trail Toad- must have come from the creek(actual size 1 quarter)

Thursday, October 8, 2009

The Playground and Brickyard Re-open Today

Having been closed since hydromulching began after the Gap Fire, the Playground and Brickyard are open again. Press Release

Sunday, September 27, 2009

National Public Lands Day A Success!

About 30 people came out this past weekend to help bring Cold Spring Trail back to life. Work consisting of tread repair, brush work, and trail restoration was completed between Camino and Montecito Peak. One major reason for this work was when an injury occured due to dangerous trail condtions on the upper part of the trail. Several months ago, someone doing trail work left debris on the trail forcing users to create a secondary trail. Removing this secondary trail was one of the main objectives of the day.

Groups including ourselves, SBMTV, Bicicentro, Crahtac, SBTC, LPNF Engine 46, and others all participated in making the day a success. Work wrapped up by about 12:30 just as the temps began to rise and all the volunteers were met on Camino Cielo by a meal catered by the Santa Barbara Chicken Ranch. Thanks to the work done this past weekend, no one else will get injured on Cold Spring Trail from substandard trail conditions.


Pre-Work Pep Talk
LPNF Engine-46 Helped With Chainsaws
One Of Many Damaged Sections- Before
Same Section- After
Another Example of Damaged Trail-Before
After
The After Party

Thursday, September 24, 2009

National Public Lands Day Is This Saturday 9/26!

As you may have heard, NPLD is this Saturday 9/26 and will be celebrated locally by the repair of Cold Spring Trail. The agencies wanted us to pass some last minute info about the event.

Meeting Location: Skofield Park, 1819 Las Canoas Rd

When: Saturday, 9/26/09-- 8 am until 2 pm. *Due to possible hot conditions this weekend, the agencies may shorten NPLD as deemed necessary.

What: Work on the brush and tread of Upper Cold Spring Trail. Good news-- there is little to no poison oak on this part of the trail!

Things To Bring: Long pants, Long sleeve shirt, Sturdy boots or shoes, bike helmet, gloves, Lots of water, sunglasses, sunscreen, snacks, your favorite lopper or handsaw
(just in case of large turnout and shortage of tools)

Other Info: No experience in trail work is necessary, you will be trained before getting out on the trail. The agencies will provide a lunch following this event.

Saturday, September 19, 2009

Paradise Road/Snyder Trail Fire Is Under Control

According to our friend at the USFS, Snyder Trail is open and the fire that started yesterday along Paradise Road, aka the "Paradise Fire", is out. The Indy had good coverage with some photos HERE. We would recommend calling the USFS before heading out just to make sure about trail and condition status- (805) 968-6640

Thursday, September 17, 2009

My First Rattler Of The Year

Usually I see one of these little guys earlier in the season. Spotted this one on Cold Spring Trail today lounging by the side of the trail until he saw me. No mistaking what a rattler sounds like!